It looks like a bug. I will check it. Thanks a lot. I am afraid, it is not possible to set date format right now, but I hope, it will not be much work to add it. Thanks, S. On 12 May 2012 12:34, Bruce <bruce@tomo.co.nz> wrote:
I have been trying to use the context option using the example from the therion book (and a variation on it).****
** **
point label -text “05 May 2012” -context point air-draught -scale xs****
** **
point date -value 2012.05.05 -context point air-draught -scale xs****
** **
Both these statements result in an error like this.****
** **
error -- IG-InceptionPlan.th2 [383] -- object context not allowed -- point air-draught****
** **
I presume this is a bug? Or is it not implemented like this?****
** **
Also, with point date, can we control the format of the output, or are we limited to dd mm yyyy? (or perhaps it is looking at my system settings?)** **
** **
Bruce****
_______________________________________________ Therion mailing list Therion@speleo.sk http://mailman.speleo.sk/mailman/listinfo/therion