Hello, I’m doing extended scraps and I notice a strange thing. When you do a “plan” scrap, if you had survey points, automatically the point number is increase each time you click in the scrap (for each survey point added). It work find. Great ! (pt1@survey, pt2@survey, pt3@survey ….) But on “extended” scrap, the phenomenon is reverse, instead of increasing the number: it decrease! (pt5@survey, pt4@survey, pt3@survey). It’s a bit surprising the first time, and you must begin from last survey points if you want to use the functionality. It would be find to have the same hay of increase for extended as for plan. Thanks, Gilbert
This is a bug, I will try to fix it. Thanks for pointing out, S. Gilbert Fernandes (mailinglist) wrote:
Hello,
I’m doing extended scraps and I notice a strange thing.
When you do a “plan” scrap, if you had survey points, automatically the point number is increase each time you click in the scrap (for each survey point added). It work find. Great ! (pt1@survey, pt2@survey, pt3@survey ….)
But on “extended” scrap, the phenomenon is reverse, instead of increasing the number: it decrease! (pt5@survey, pt4@survey, pt3@survey). It’s a bit surprising the first time, and you must begin from last survey points if you want to use the functionality.
It would be find to have the same hay of increase for extended as for plan.
Thanks,
Gilbert _______________________________________________ Therion mailing list Therion@speleo.sk http://www.speleo.sk/mailman/listinfo/therion
participants (2)
-
Gilbert Fernandes (mailinglist) -
Stacho Mudrak